India's high-voltage power transmission network at dusk
AI for India's infrastructure decade

Intelligence for how India builds.

AI decision systems for planners, utilities and ministries building India's next trillion dollars of infrastructure.

₹143 L Cr
planned infra capex, 2020–2025
NIP, GoI
40+
central & state approvals for a typical linear project
MoP, MoEFCC
2–5 yrs
delay range across power, roads, gas, rail
MoSPI Flash Report
1
unified decision layer across ministries
Greeniti
Our thesis

India's infrastructure problem isn't concrete. It's coordination.

A single transmission line touches the ministries of power, environment, forests, tribal affairs, defence, railways and up to a dozen state agencies. A gas pipeline, a metro line, a highway — the same tangle, different names.

Every planner rebuilds the same map by hand. Rules live in PDFs. Constraints live in siloed GIS layers. Delay patterns live in audit reports that no one reads before commitment. The result: projects slip years, clean-energy targets miss, and capex earns less than it should.

Greeniti applies modern AI — retrieval, reasoning and geospatial models — to compress that coordination into a decision environment planners can actually use.

First application

A regulatory sandbox for power transmission.

Transmission is India's most acute bottleneck — 84% of TBCB projects miss schedule, and clean-energy targets ride on fixing it. We're building the first version of the platform here because if AI can solve for transmission, it can solve for the rest.

How the platform works →
Live pilot in build
Draw a corridor. Get a scored regulatory pathway in minutes — not months.
  • Approvals & sequencing auto-mapped
  • 12+ GIS constraint layers overlaid
  • Delay triggers from CEA & CAG data
  • Alternative routes scored side-by-side
The roadmap

One engine. Many sectors.

The same underlying stack — regulation graph, constraint overlays, delay-pattern models — generalises across every linear and land-intensive sector in Indian infrastructure.

See all applications →
01First application — live pilot in build

Power Transmission

Corridor risk, forest and land clearance sequencing, RE evacuation readiness.

02In design

Power Distribution

Feeder-level planning against reliability, loss and RDSS compliance.

03In design

City Gas Distribution

GA rollout planning against RoU, PNGRB norms and demand geography.

04Research

Urban & Master Planning

Land use, mobility and utility overlays for cities and industrial corridors.

05Research

Highways & Rail

Linear infrastructure alignment under forest, tribal and defence overlays.

06Research

Water & Irrigation

Basin-level planning under environmental and inter-state constraints.

What we believe
Evidence over opinion.

Every recommendation is traceable to a rule, a dataset or an audited precedent.

Coordinate, don't replace.

We augment the planner. Statutory authority stays with the state.

Built for Indian reality.

Designed around Indian law, Indian data and Indian institutional workflows — not adapted from elsewhere.

Work with us

Building infra? Let's plan it better.

We partner with utilities, ministries, developers and multilaterals to bring AI into planning workflows — starting with a scoped pilot on a real corridor, feeder or GA.